Comprehensive Project Risk Management Methodology

Authors

  • Luis F. Copertari

DOI:

https://doi.org/10.14738/assrj.81.9568

Keywords:

Risk management; project management; decision support systems.

Abstract

The objective of this paper is to introduce and discuss the basics of a methodology called the Probabilistic Critical Path Method (PCPM) for managing the previously identified risks (uncertainty) of the three project management dimensions: time, cost and return (performance). An interactive Graphic User Interface (GUI) has been designed for visualizing the tradeoffs among these three dimensions as well as their uncertainties on a flat computer screen. The user can choose to visualize the probability of failure (exceeding some user given due date, budget or not exceeding a given Minimally Attractive Rate of Return – MARR) or the probability of success (not exceeding the due date and the budget and exceeding the MARR). PCPM allows for comprehensive project risk management and it constitutes a new integrative project risk management framework. This paper shows that it is possible to integrate all three project management dimensions (time, cost and return) and show their known risks as well as determining the optimal cost and the associated time and return for such optimal cost. Finally, it is possible to interactively show all this multidimensional information on a flat computer screen.

References

Adams, C. (2001). Risk aversion. Project Finance, 2-5.

Auguston, K. A. (1993). Activity-based costing adds up to big benefits. Modern Materials Handling, 48(7), 57-59.

Babu, A. J. G. & Surech, N. (1996). Project management with time, cost, and quality considerations. European Journal of Operational Research, 88(2), 320-327.

Brealey, R. A. & Myers, S. C. (1991). Principles of Corporate Finance. New York: McGraw Hill.

Buganová, K. & Šimíčková, J. (2019). Risk management in traditional and agile project management. Transportation Research Procedia, 40, 986-993.

Burden, R. L. & Faires, J. D. (1985). Análisis Numérico (Numerical Analysis). Belmont, California: Grupo Editorial Iberoamérica.

Chapman, C., & Ward, S. (1997). Project Risk Management: Processes, Techniques and Insights. John Wiley & Sons.

Clark, R. H. (1992). Benefit/Cost Analysis for Trenchless Alternatives. Transactions of the American Association of Cost Engineers, 2, Q.1.1-Q.1.8.

Copertari, L. (2014). Evaluación Financiera de Proyectos (Financial Project Evaluation). Zapopan, Jalisco, México: Editorial Umbral.

Dawson, R. J. (1998). Practical proposals for managing uncertainty and risk in project planning. International Journal of Project Management, 16(5), 299-310.

Dey, P. K. (2001). Project time risk analysis through simulation. Cost Engineering, 43(7), 24-32.

Farrell, L. M. (1996). The impact of illiquidity and uncertainty of the multiperiod project investment decision process. Project Management Journal, 27(3), 35-45.

Foldes, S. & Soumis, F. (1993). PERT and crashing revisited: mathematical generalizations. European Journal of Operational Research, 64(2), 286-294.

Hastings, N. A. J. & Peacock, J. B. (1975). Statistical Distributions. New York: John Wiley & Sons.

Icmeli, O. (1996). The resource constrained time/cost tradeoff project scheduling problem with discounted cash flows. Journal of Operations Management, 14(3), 255-275.

Johnson, G. A., & Schou, C. D. (1990). Expediting projects in PERT with stochastic time estimates. Project Management Journal, 21(2), 29-34.

Khameneh, A., Taheri, A., & Ershadi, M. (2016). Offering a framework for evaluating the performance of project risk management system. Procedia – Social and Behavioral Sciences, 226, 82-90.

Lefley, F. (1997). Approaches to risk and uncertainty in the appraisal of new technology capital projects. International Journal of Production Economics, 53(1), 21-43.

McManus, J. (2001). Risk in software projects. Management Services, 45(10), 6-10.

Meredith, J. R., & Mantel, Jr., S. J. (1995). Project Management: A Managerial Approach. New York: John Wiley & Sons.

Odimabo, O. & Oduoza, C. (2018). Guidelines to Aid Project Managers in Conceptualising and Implementing Risk Management in Building Projects. Procedia Manufacturing, 17, 515-522.

Rivenbank, W. C. (2000). Benchmarking and cost accounting: the North Carolina approach. Journal of Public Budgeting, Accounting and Financial Management, 12(1), 125-147.

Schimmoller, B. K. (2001). The shifting sands of risk management. Power Engineering, 105(9), 3.

Serpella, A. F., Ferrada, X., Howard, R., & Rubio, L. (2014). Risk management in construction projects: a knowledgebased approach. Procedia – Social and Behavioral Sciences, 119, 653-662.

Sunde, L., & Lichtenberg, S. (1995). Net-present value cost/time tradeoff. International Journal of Project Management, 13(1), 45-49. 114

Copertari, L. F. (2021). Comprehensive Project Risk Management Methodology. Advances in Social Sciences Research Journal, 8(1) 94- 115.

Szymański, P. (2017). Risk management in construction projects. Procedia Engineering, 208, 174-182.

Tattersall, J. (1990). Understanding overheads – their management and control. Management Decision, 28(4), 4-8.

Tavares, L. V. (1998). On the optimal management of project risk. European Journal of Operational Research, 107(2), 451-469.

Walker, L. E. (2001). Advantages of risk-based project management. Occupational Health & Safety, 70(9), 161-164.

Winston, W. L. (1994). Operations Research: Applications and Algorithms. Belmont, California: Duxbury Press.

Downloads

Published

2021-01-17

How to Cite

Copertari, L. F. (2021). Comprehensive Project Risk Management Methodology. Advances in Social Sciences Research Journal, 8(1), 94–115. https://doi.org/10.14738/assrj.81.9568

Most read articles by the same author(s)