Randomly Correlated Data

Authors

  • Luis F. Copertari Computer Engineering. Autonomous University of Zacatecas (UAZ). Zacatecas, México
  • Gloria V. Reyna-Barajas Psychology Department. Autonomous University of Zacatecas (UAZ). Zacatecas, México
  • Georgina Lozano-Razo Psychology Department. Autonomous University of Zacatecas (UAZ). Fresnillo, México
  • Javier Zavala-Rayas Psychology Department. Autonomous University of Zacatecas (UAZ). Fresnillo, México

DOI:

https://doi.org/10.14738/assrj.1301.19910

Keywords:

Random, correlation, data, positive, negative

Abstract

The random correlation data algorithm allows the creation of two randomly correlated variables having a relatively strong positive or negative correlation between them. We have used this algorithm in project management and, more specifically, in project portfolio selection. This paper describes the most important concepts and portrays the relevant equations for the algorithm being considered. The equations can be applied to other domains of inquiry. Also, although the random distribution generator was uniformly distributed, other random generators can be used, such as normally distributed random generators.

References

Archer, N. & Ghasemzadeh, F. (1999). “An integrated framework for project portfolio selection”, International Journal of Project Management, 17(4), 207-216.

Brealey, R. A., & Myers, S. C. (1991). Principles of Corporate Finance. McGraw Hill.

Cooper, R. G., Edgett, S. J., & Kleinschmidt, E. J. (2007). Portfolio Management for New Product Development – Results of an Industry Practices Study. Product Development Institute.

Copertari, L. F. (2020). Comprehensive Project Risk Management: The Probabilistic Critical Path Method (PCPM). Lambert Academic Publishing.

Copertari, L. F. (2025). Investigación de Operaciones. Editorial Académica Española.

Coss Bu, R. (1991). Simulación: Un enfoque práctico. Noriega Limusa.

Elsayed, E. A. & Boucher, T. O. (1994). Analysis and control of production systems. Prentice Hall.

Icmeli, O. (1996). “The resource constrained time/cost tradeoff project scheduling problem with discounted cash flows”, Journal of Operations Management, 14(3), 255-275.

Johnson, G. A., & Schou, C. D. (1990). “Expediting projects in PERT with stochastic time estimates”, Project Management Journal, 21(2), 29-34.

Kvanli, A. H., Guynes, C. S., & Pavur, R. J. (1989). Introduction to Business Statistics: A Computer Integrated Approach. West Publishing Company.

Meredith, J. R., & Mantel, S. J. (2008). Project Management: A Managerial Approach. John Wiley & Sons.

Sunde, L., & Lichtenberg, S. (1995). “Net-present value cost/time tradeoff”, International Journal of Project Management, 13(1), 45-49.

Walpole, R. E., & Myers, R. H. (1989). Probabilidad y Estadística para Ingenieros. McGraw Hill.

Winston, W. L. (1994). Operations Research: Applications and Algorithms. Duxbury Press.

Downloads

Published

2026-01-27

How to Cite

Copertari, L. F., Reyna-Barajas, G. V., Lozano-Razo, G., & Zavala-Rayas, J. (2026). Randomly Correlated Data. Advances in Social Sciences Research Journal, 13(01), 136–144. https://doi.org/10.14738/assrj.1301.19910