The General Understanding Of Risk In Construction Industry In Ghana: The Consultant Perspective.

Authors

  • Atta Agyeman Junior
  • TIMOTHY Adu GYAMFI Koforidua Technical University

DOI:

https://doi.org/10.14738/assrj.410.2919

Abstract

The roll of consultants in construction industry cannot be under estimated, from project conception to final completion the consultants are front liners therefore there is a need to understand their perception on risk in construction industry for their effective functioning. The purpose of the study was to understand how consultants in Ghana perceive risk in construction industry. The study objective was to identify consultant’s perception on the causes of risk in construction industry in Ghana and examine the relationship between consultant’s concept of risk and perception on uncertainty.The study adopted a quantitative approach involving a cross-sectional design using survey, questionnaires administered to a population of 355 consultants of the Ghana Consulting Engineering Association (GCEA). Descriptive statistics, cross tabulations, Chi-square were used to analyze the resulting data. The study found that the major causes of risk in construction are usage of substandard materials in construction industry, harmful work-related experience, and the dangers in construction. The study further shown that risks were not the same as uncertainties in construction projects that risks could not lead to positive outcome but the positivity of risks depends on the type of projects the consultants worked on. It also reveal that theft and lack of a critical checklist were the major sources of risks in the construction industry. On the bases of the founding’s the study sort to recommend that effective and efficient monitory system should be implemented at construction site to curtail all issues related to theft. Again investigation should be conducted to examine consultants’ perception on the impact of risks in the construction industry.

Author Biography

TIMOTHY Adu GYAMFI, Koforidua Technical University

Building Tecchnology Department

Lecturer

References

Agyakwa-Baah, A. (2009). A study into risk assessment and management practices within Ghanaian medium and large construction organizations. Unpublished MSc Project Management Dissertation, Built Environment Department, Sheffield Hallam University, United Kingdom.

Adu Gyamfi, T. and Boadaa, R. (2015). The effect of procurement management practices on risk management in construction firms. International journal of science: Basic Applied Research, vol.24 (3), 403 – 420.

Akintoye, A. S., & Macleod, M. J. (1997).Risk analysis and management in construction.International Journal of Project Management, 12(1), 31-38.

Babbie, E. (2005). The basics of social research. Belmont: Thomson Wadsworth.

Bernstein, B. (1999) Vertical and horizontal discourse: an easy. British journal of sociology of Education, 6(2) 20-30.

Buertey, J. I. T., Abeere-Inga, F., &Kumi, T. A. (2012). Practical application of risk management techniques in infrastructural delivery: A case study of Ghanaian construction industry. Journal of Construction Project Management and Innovation, 2(1), 224 – 244.

Carter, R. L., & Doherty, N.A. (1974).Handbook of risk management. London: Kluwer-Harrap Handbooks.

Chapman, C., & Ward, S. (1997). Project risk management: Process techniques and insights. England: John Wiley and Sons Ltd.

Chileshe, N., &Yirenkyi-Fianko, A. B. (2011). Perceptions of threat risk frequency and impact on construction projects in Ghana: Opinion survey. Journal of Construction in Developing Countries, 16(2), 115–149.

Chileshe, N. (2004). The application of TQM within small and medium sized construction related organizations. Unpublished PhD Thesis, School of Construction, Sheffield Hallam University, Sheffield, UK.

Claycamp, H. G. (2012). Probability concepts in quality risk management. Journal of Pharmacy, Science and Technology, 66(1), 78-89. doi: 10.5731/pdajpst.2012.00801.

Creswell, J. W. (2003) Research design qualitative, quantitative and mixed method approaches second edition. Sege publication califonia.

Dadzie, J., Abdul-Aziz, A. R., Kwame, A. (2012). Performance of consultants on government projects in Ghana: Client and contractor perspective. Journal of Business, 2(6), 256-267

Ehsan, N., Alam, M., Mirza, E., &Ishaque, A. (2010).Risk management in construction industry.Journal of Production and Performance Management, 61(2), 173-193

Ehsan A., Anjelo, F. D., Kujur, F. E., &Chaudhary, M. (2014). Risk management strategies for accidental risk occurrence on construction sites: A case study of Allahabad. Journal of Academia and Industrial Research, 3(2), 89-91.

Flanagan, R., & Norman, G. (1993).Risk management and construction. London: Blackwell Science Ltd.

Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in developing countries: Ghana as a case study. International Journal of Project Management, 21, 321-26.

Ghahramanzadeh, M. (2013). Managing risk of construction project a case study of Iran. Retrieved on October 20, 2014 from http://www.riskmanagementinsight.com/media/docs/FAIR_introduction.pdf

Godfrey, P. (1996). Control of risk: A guide to the systematic management of risk from construction. London: Construction Industry Research and Information Association.

Hassanein A. G., &Afify, H. M. (2007). Contractor’s perceptions of construction risks: A case study of power station projects in Egypt. Cost Engineering, 49(5), 25-34.

Hayes, R., Perry, J., & Thompson, J. (1986).Risk management in engineering construction: a guide to project risk analysis and risk management. London: Thomas Telford

Hopkin, P. (2012). Fundamentals of risk management (2nd ed.). London: Kogan-Page.

Hubbard, H. (2009). The failure of risk management: Why it's broken and how to fix it.Chichester: John Wiley & Son

Ijaola, I. (2012). An analysis of contractors’ approaches to risk management practices in Lagos state, Nigeria. In S.

Laryea, S.A. Agyepong, R. Leiringer, and W. Hughes, (Eds), Proceedings of the 4th West Africa Built Environment Research (WABER) Conference,24-26 July 2012, Abuja, Nigeria, pp. 687-695.

Jones, J. A. (2006). An introduction to factor analysis of information risk (FAIR).Retrieved on October 14, 2014 from http://www.riskmanagementinsight.com/media/docs/FAIR_introduction.pdf

Key, J. P. (1997). Qualitative research. Retrieved July 24, 2007, from http://www.okstate.edu/ag/agedcm4h/academic/aged5980a/5980/newpage21.htm

Krejcie, R. V. and Morgan, D. W. (1970) Determining the sample size for research activities. Journal of Educational and psychological measurement, (30) 607- 610.

Odonkor, A. K. (2011).The effect of strategic risk management on project delivery: A case study of the construction industry in Ghana.Unpublished thesis for Commonwealth Executive Master of Business Administration Institute of Distance Learning, KNUST

Panthi, K., Ahmed, S., Ogunlana, S. (2009). Contingency estimating for construction projects through risk analysis. International journal of construction education and research, 5, 79 94

Popova-Clark, J. (2011). Risk management: Better, but still not there yet. Retrieved on February 15, 2014 from http://www.dataanalytics.com/pdf/BetterRiskMgt.pdfnd

Sarantakos, S. (1998). Social research 2 edition. Basingstoke, Macmillan.

Sarantakos, S. (2005). Social research. Hampshire: Palgrave Macmillan.

Smith, A, Mortledge, R., & Kashiwagi, D. T. (2006). Building procurement. Oxford, U.K: Wiley Blackwell

Smith, N. J. (2003). Appraisal, risk and uncertainty. London: Thomas Telford Ltd.

Wang, S. Dulaimi, M., &Aguria, M. (2004). Risk management framework for construction projects in developing countries. Construction Management and Economics, 22, 237-252

Zou1, P. X. W., Zhang, G., & Wang, J-Y. (2006). Identifying key risks in construction projects: Life cycle and stakeholder perspectives. Retrieved on February 15, 2013from http://www.prres.net/papers/Zou_risks_in_construction_projects.pdf

Downloads

Published

2017-05-29

How to Cite

Agyeman Junior, A., & Adu GYAMFI, T. (2017). The General Understanding Of Risk In Construction Industry In Ghana: The Consultant Perspective. Advances in Social Sciences Research Journal, 4(10). https://doi.org/10.14738/assrj.410.2919