Financial Effect of Labour Related Risks on Completion of PPP Projects
DOI:
https://doi.org/10.14738/assrj.710.9191Keywords:
Financial Cost, Labour Related Risks, Completion of PPP Projects, Public-Private PartnershipAbstract
Efficient management of construction works should focus its attention on utilizing labour, equipment, and raw materials in the right way. Besides, they claim that responsible parties should evaluate labour productivity continuously and that cost control measures should be developed. Low productivity witnessed in construction is linked to internal challenges including disputes, abandonment of projects, excess budget, and time overlaps. The objective of the study was to determine the financial effect of labour related risks on completion of PPP projects. A descriptive survey design was used with simple random sampling targeting 85 members of the management team at the completed Sondu-Miriu Power project. The participants were administered with questionnaire which were sent by mail (in some cases) and selected participants encouraged to respond. Data obtained was analysed through SPSS platform using descriptive statistics and Pearson Moment correlation as inferential statistics. The study found that labour related risks in construction PPP projects included failure by employees and experts to complete assigned tasks, injuries and deaths, changing labour demands during the project as well as cases of go slow. Construction labour related risks affected the financial cost, time and quality of work performed in the construction project. The study concludes that labour related risks have a financial effect on completion of PPP projects such that as the risks increase, the financial cost increases. The study recommends that more focus should be placed on the identification and recruitment of project staff as well task allocation.
References
Raz, T., Shenhar A.J., & Dvir D., (2012). Risk management, project success and technological uncertainty, R&D Management Blackwell Publishers. Vol. 32, No. 2, pp. 101-109
Smith, N. J., Merna, T., & Jobling, P. (2006). Managing risk in construction projects. Chichester, West Sussex, United Kingdom: John Wiley & Sons Inc.
Murali, S., & Yau, W. S. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25 (5), 517-526.
Odeh, A. A., & Battaineh, T. H. (2002). Causes of construction delay: traditional contracts‖, International Journal of Project Management, 20(1); 67-73.
Yaw, F., & Oluwoye, J. (2003). Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. Journal of Construction Research, 4(2), 175-187. doi:10.1142/S1609945103000418
Sadi, A. A., Asce, M. A., & Muhammad, A. (2006). “Causes of Delay in Large Building Construction Projects”. Journal of Management in Engineering, II (2), 45-50.
Sweis, G., Sweis, R., Abu Hammad, A. & Shboul, A. (2007). ‘Delays in construction projects: The case of Jordan’, International Journal of Project Management,26 (6) 665-74
Hendrickson, C., & Au, T. (2003). Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects and Builders. Pittsburgh: Prentice Hall
Alinaitwe, H. M., Mwakali, J. A., & Hansson, B. (2007). Factors affecting the productivity of building craftsmen studies of Uganda, Journal of Civil Engineering and Management 13(3): 169–176.
Kaming, P. F., Olomolaiye, P.O., Holt, G.D. & Harris, F.C. (1997). Factors influencing construction time and cost overruns on highrise projects in Indonesia, Journal of Construction management and Economics, 15(1); 83-94.
Tipili, G.L., & IIyasu, M.S. (2014). Evaluating the impact of risk factors on construction projects cost in Nigeria. The International journal of Engineering and Science (IJES). 3(6), 10-15.
Takashi, S., Park, Y. W., & Hong, P. (2012). “Project managers for risk management: case for Japan", Benchmarking: An International Journal, 19(4/5), 532-547. 129
Soham, M., & Rajiv, B. (2013). Critical factors affecting labour productivity in construction projects: Case study of South Gujarat Region of India. International Journal of Engineering and Advanced Technology. 2 (4), 583-591.
Ghoddousi, P., & Hosseini, M. (2012). A survey of the factors affecting the productivity of construction projects in Iran. Technological and economic development of economy. 18 (1), 99-116.
Attar, A. A, Gupta, A. K., & Desai, D. B. (2012). A Study of Various Factors Affecting Labour Productivity and Methods to Improve It. Journal of Mechanical and Civil Engineering. 5 (2), p11-14.
Abdul Kadir, M. R., Lee, W. P., Jaafar, M. S., & Sapuan, S. M. (2005). Factors affecting construction labour productivity for Malaysian residential projects. Emerald. 23 (1), 42-54.
Zakeri, M., Olomolaiye, O. P., & Gary, D. (2010). A survey of constraints on Iranian construction operatives' productivity. Construction Management and Economics. 14 (5), 417-426.
Olabosipo, F., Ayodeji, O. A., & Owolabi, J. (2011). Factors affecting the performance of labour in Nigerian construction sites. Meditterranean Journal of Social Sciences. 2 (2), 251-257.
Wijekoon, S. B. (2006). Evaluation of labour productivity in bridge construction projects. Journal of Management in Engineering. 14 (2), 92-103.
Durdyeu, S., & Mbachu, J. (2012). On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures. Australasian Journal of Construction Economics and Building. 11 (3), 18-33.
Njogu, P. M. (2015). Assessment of effects of construction risks on project delivery among contractors in Kenya (Unpublished master's thesis). Jomo Kenyatta University of Science and Technology.
Ailabouni, N., & Gidado, K. (2009). Evaluation of factors affecting productivity in the UAE construction industry; regression models. Journal of Management in Engineering. 4 (4), p131-142.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2020 Pamela Akinyi Oyieyo, Charles Rambo, Anne Ndiritu

This work is licensed under a Creative Commons Attribution 4.0 International License.