The Impact of Performance Based Budget (Pbb) on Projects Effectiveness, Quality and Sustainability in Fako and Meme Divisions of the South West Region, Cameroon
DOI:
https://doi.org/10.14738/abr.98.10630Abstract
The study examined the impact of performance based budget on projects effectiveness, quality and sustainability in Fako and Meme Divisions of the South West Region, Cameroon. Three specific objectives were formulated to guide this study. The objectives investigated the impact of performance based budget on the effectiveness of projects, the impact of performance based budget on the quality of projects and the impact of performance based budget on the sustainability of projects. Ex-post facto research design was used for this study. The sample of this study was made up 420 respondents comprising of service providers, beneficiaries of the projects and staff of the Regional Delegation of Water and Energy and the Regional Delegation of Public Works in Fako and Meme Divisions. A well validated structured questionnaire was used for data collection. Data collected were analyzed using descriptive statistics and dependent t-test. Findings revealed that there exist a significant difference in the quality of roads, water and electricity projects before and after implementation of performance based budget with the quality of roads higher after the full implementation than before the implementation of PBB. There exist a significant difference in the effectiveness of road, water and electricity projects before and after implementation of water projects, and there exist a significant difference in the sustainability of road, water and electricity projects before and after implementation of performance based budget. The study recommended that the effectiveness of the budgetary system should be improved so that the quality and sustainability of projects will be obtained. Moreover, good budget begets good results.
References
Agarwal, S. R., Kalma, T. & Semenova N. (2015). Sustainability in Project Management: Eight Principles in Practice, Umea School of Business Economics p1-110.
Altmayer, C. (2006) “Moving to Performance Budgeting”, Government Finance Review, 22 (3) p8-14.
Atkinson, R. (1999). Project Management: Costs, Time and Quality, two best guesses and phenomenon it’s time to accept other success criteria. International Journal of Project Management, 17(6), p337-342.
Cooke-Davis, T. J. (2002). The real success factor on project. International Journal of Project Management, 20(3), p185-190.
Crawford, P. & Bryce, P. (2003). Project Monitoring and Evaluation: A Method for enhancing the efficiency and effectiveness of projects implementation. International Journal of Project Management, p323-373.
Crosby, P. B. (1979). Quality is free. New York: Mc Graw-Hill.
Deming, W. E. (1982). Quality, Productivity and Competitive Position. Cambridge MA:Massachusetts Institute of Technology, Center for Advanced Engineering study.
Folscher, A., Mkandawire, A. & Farogher, R. (2012). Evaluation of Public Financial Management Reform in Malawi: 2001-2010 Final Country Case Study Report. SIDA61500en.
Ginny, W., Hager, G. & Hobson, A. (2001). Performance-Based Budgeting: Concepts and examples. Kentucky: Frankfort Kentucky. Retrieved July 22, 2017.
Greg, H. (2003). Performance Based Budgeting California State Government: A Blue print for effective Reform ACCY 299. th
Juran, J. M. & Gryna, F. M. (1988). The quality Control Handbook (4 ed.). New York: McGraw Hill.
Juran, J. M. (1986). The quality trilogy: A universal approach to managing for quality. Quality Progress, 19(8), p19-24
Juran, J. M. (1988). Juran on planning for quality. New York Free Press. rd
Kerlinger, F. N. (1986). Foundations of Behavioral Research, 3 edn, Holt Rinehart & Winston
Klase, K. A. & Dougherty, M. J. (2008). The Impact of Performance Budgeting on State Budget Outcomes. Journal of Public Budgeting, Accounting & Financial Management, 20 (3), 277-298
Melkers, J. E. & Willoughby, K. G. (2001). “Budgeters’ Views of State Performance-Budgeting Systems: Distinctions across Branches.” Public Administration Review, 61 (1): 54-64.
MINEE, (2015). Contract for the construction of borehole at Kie Village Fako Division South West Region of Cameroon
MINEPAT, (2016). Mid-Term evaluation report on the execution of the public investment budget in the South West Region of Cameroon
Ning, C., Zhang, S. & Li, L. (2009). Sustainable Project Management: A balance Analysis of effect. International Conference on Management and Service Science Wuhan, China
OECD, (2002). Overview of Results focused Management and Budgeting in OECD countries, Twenty-Third Annual meeting of OECD senior budget official, 3-4 June PUMA/SBO, Washington DC, Online document assessed 17/8/2017
Anyingang, R. A. (2021). The Impact of Performance Based Budget (Pbb) on Projects Effectiveness, Quality and Sustainability in Fako and Meme
Silvius, A. J. G. & Schipper, R. (2012). Sustainability in Project Management. Farnham: Gower publishing p21-44.
Still, D. A. (2014). Key Performance indicators in Rural Water Supply, Partner in Development (Pty) Ltd South Africa dave@pid.co.za p1-13
Sundqvist, E., Backlund, F. & Chronéer (2014). What is project efficiency and effectiveness? Procedia-Social and Behavioral Sciences Swedish 119 p273-287.
Takim, R., Alam, S. & Adnan, H. (2008). Analysis of effectiveness Measures of Construction Project Success in Malaysia. Asian Social Science 4(7) p74-81
Thor, N., Allred, S., Ball, J., Dineheart, B., Bill, G. & Walthers, K. (1999). Performance-Based Budgeting and the department of Human Sciences. Report to the executive Appropriation committee prepared by office of the legislative fiscal Analyst, Division of child and family services (department of human services).
Titi, P. (2011). The Development of Performance-Based Budgeting System. Public Finance Reform. Yaoundé center region CAMEROON.
Willoughby, K. & Melkers, J. (2000). “Implementing Performance-Based Budgeting: View of Success”. Public Budgeting and Finance, 20(1), p105-120.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2021 Roland A. Anyingang

This work is licensed under a Creative Commons Attribution 4.0 International License.