PRODUCTION PLANNING AND RAW MATERIALS SUPPLY TO MEET FLUCTUATIVE DEMAND FOR LIVESTOCK FEED FLOUR
DOI:
https://doi.org/10.14738/abr.69.5153Keywords:
production planning, raw material inventory, JIP, MPS, MRP.Abstract
Production is creating goods and services, CV Bulu Nusantara is a company that processes poultry feathers, fish bones, beef bones, shells into dough flour for livestock feed. Sometimes these companies encounter overproduction and sometimes production shortages. The researcher intends to run production planning and raw material need planning that can meet fluctuative demand and minimize production costs with JIP and MRP approaches. From the research carried out, obtained forecasting demand result for period June 2017 - May 2018 for feather flour, fish flour, bone meal and crab flour for 191,040 kg, 144,876 kg, 135,189 kg and 158,028 kg. From production master schedule made based on forecasting and production capacity result, a plan is obtained for June 2017 - May 2018 of Rp. 1,858,057,638. Material requirements planning (MRP) can be seen when, how many orders, how many times the order for raw materials is within 1 year, so that the raw material inventory is optimal in accordance with the master production schedule, in addition to MRP also obtained for the total cost of raw materials for planning period June 2017 - May 2018 amounting to Rp. 16,710,197,190. From the cost of labor and raw materials, total production planning is Rp. 18,568,254,838, if the total cost of production planning is compared to the total production costs of the company in 2016-1017 amounting to Rp. 18,690,250,000 then the difference in annual production costs of Rp. 121,995,170. This means that by implementing JIP and MRP systems the company will save production costs by Rp. 121,995,170.
References
Baroto, Teguh, 2002. Perencanaan dan Pengendalian Produksi, Jakarta : Ghalia Indonesia David W. Pentica, 1979. Material Requirements Planning : Journal Hospital Topics 57, pp. 40-43 (May – June 1979)
Gasperz, Vincent. 2004. Production Planning and Inventory Control. Jakart : PT Gramedia Pustaka Utama.
Heizer, Jay, and Bary Render. 1997. Production and Operation Management, Fourth Ed. Upper Saddle River. NJ. Prentice Hall John G. Wacker. 1985. Effective Planning and Cost Control for Restaurants. Journal Production and Inventory Management. pp. 55-70
Kusuma, Hendra. 2002. Perencanaan dan Pengendalian Produksi. Yogyakarta : Andi.
Makridakis. 1993. Metode dan Aplikasi Peramalan, Jakarta : Bina Aksara.
Nasution, Arman Hakim. 1999. Perencanaan dan Pengendalian Produksi. Jakarta : Guna Widya.
Render, B., and R.M. Stair. 1997. Quantitative Analysis for Management , Sixth Ed. Upper Saddle River, NJ : Prentice Hall.
Sivakumar, R.A., R. Batta and Tehrani. Scheduling Repair at Texas Instruments, Interface 23, No 4 (July – August 1993) pp. 68-74.
Sutalaksana, Iftikar. 1979. Teknik Tata Cara Kerja. Bandung : Institut Teknologi Bandung.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2018 Archives of Business Research

This work is licensed under a Creative Commons Attribution 4.0 International License.