Abstract

Optimization methods in mining industry, taking into account the time factor develop abroad  from the end of 19 century. However, in the context of policy centrally planned economy development of dynamic methods substantially restrained. In the last decade have developed research in the field of dynamic methods for solving design problems of the domestic mining industry, including a number of official recommendations [1, 2]. However, the formation of a national market economy, especially the contemporary stage of the open mining (particularly complex), the development of mineral resources markets require constant adjustment and improvement of dynamic design techniques of quarries. In the mining industry specific investments, establishing the capital investment is several times bigger than the in manufacturing industries.  Dynamic evaluation methods taking into account the time factor can help you determine the value of the investment in time unlike the way economic evaluation methods. Mineral markets there is a tendency for problems with the deterioration of the of economic indicators of development. This is due to the oxygen dissipated rich deposits, increasing depth development, involvement in the development of minerals with lower quality involved and content of useful components, to be found in the more difficult geological and location conditions. Investment opportunities of the development mineral-raw materials base have significant limitations, the result of which is a disproportion between the mining, metallurgical or processing capacity.

References

Arsentiev, A.I., Performance quarries. Saint-Petersburg: State mining institute(technical university, 2010. pp: 85.

Burenina, G., analysis of the risks of industrial enterprise. Saint-Petersburg: SPBGUEF.. 2009.

Kerzner, H., Project management a systems approach to planning, scheduling, and controlling. New York: John Wiley. 2009.

Kruk M.N. ,Nikulina A.U. Economic estimation of project risks when exploring sea gas and oil deposits in the Russian arctic / International Journal of Economics and Financial Issues, № 6, V 2, 2016, pp. 138 - 150.

A Guide to the Project Management Body of Knowledge, (2010). In Project Risk Management (Vol. 11). Project Management Institute. ISBN: 1933890711

Surface and underground mining. (2013). In Bureau of Mines cost estimating system handbook (p. 631). U. S. Bureau of Mines.

Meredith, J.. & Mantel, S. Project management a managerial approach (8th ed.), Hoboken. N.J.:Wiley. 2012, 589. ISBN: 0470533021, 9780470533024, LCCN: 2011292704

Hill J.H. Geological and economical estimate of mining projects. London.1993

Semenov, A. Assessment of project risk in the hierarchical organization of the process of design of complex technical systems. World Applied Sciences Journal. 30(8).2014. 1080-1082. ISSN 1818-4952 DOSI Publications. 2014 DOI: 10.5829/idosi.wasj.2014.30.08.14114

Semenov A. S. ,Kuznetsov V. S. Assessment of level of risk in decision-making in terms of career exploitation /International Journal of Economics and Financial Issues, № 5, V 1, 2016. pp. 165 - 172.

Qi, E. Proceedings of 20th International Conference on Industrial Engineering and Engineering Management theory and apply of industrial engineering. Heidelberg: Springer.2013 ISBN 978-3-642-40063-6, DOI 10.1007/978-3-642-40072-8

Downloads

Published

2017-05-29

How to Cite

Semenov, A. S., & Kuznetsov, V. S. (2017). Identification Of Core Indicators Of The Dynamic Efficiency Evaluation Method Of Design Solutions. Archives of Business Research, 5(5), 94–105. https://doi.org/10.14738/abr.55.3140